Citadel Bed Frame System
NURSING CARE
It is recommended that all chapters of this manual be reviewed prior to product
use. Carefully read the
Contraindications, Risks and Precautions and Safety
Information
sections of the Introduction chapter of this manual prior to performing
nursing care for a patient on the Citadel Bed Frame System.
CPR
The following steps indicate how to place the bed into the CPR position.
1. Press and hold the CPR button. 7KLVZLOOLPPHGLDWHO\ÀDWWHQ
the head and knee sections and return the frame to level from the
Trendelenburg or reverse Trendelenburg positions. If the bed is set to
a height > 480mm (19 in), then activating the CPR function will also
ORZHUWKHEHGWRPPLQ7KH&35EXWWRQVZLOOÀDVKRQDOO
control panels and an audible tone will sound. If installed, the Citadel
3DWLHQW7KHUDS\6\VWHPZLOOGHÀDWHWKHPDWWUHVVDQGWXUQRII
2. Lower side rails.
3. Remove headboard, if necessary.
4. Depending on the patient support surface in use, a crashboard may
be needed.
5. Begin CPR. Follow institution CPR guidelines.
6. Reinstall headboard, if necessary.
7. Raise and lock side rails.
8. If applicable, resume therapy as directed by physician.
9. Adjust patient surface for patient comfort.
In a fault or power loss condition where the CPR button is not responding, use the
CPR backrest release to position the patient for CPR. If installed, the Citadel Patient
7KHUDS\6\VWHPZLOOGHÀDWHWKHPDWWUHVVDQGWXUQRII