Advanced DVB-S2 Receiver Operational Manual
SR1 Specifications
17
5.4
Installation Procedure
5.5
Power UP
The power up includes the following:
Plug the DC into the SR1.
Verify that the Power LED blinks between the Red and Green for ~15 seconds and then
remains Green.
Note: If the LED does not turn green after 15 seconds, refer to Chapter 8 - Trouble Shooting
5.6
Configuration
Configure the following parameters:
RF frequency: For further details refer to 7.4.1.
MPE Filters: For further details refer to
8.8.4.
Default Gateway IP Address: For further details refer to 7.6.
5.7
Cables Connection
Connect the cables to the SR1 in the following order:
RF
LAN
Management
Power
Note:
Serial management is optional. It should be used for initial configuration only.