iii
Contents
The Role of This Manual
Chapter 1. PRELIMINARIES
1-1
Names and function of parts
1-1
Method of key operations 1-2
Chapter 2. PARA BANK SETTINGS 2-1
Mode bank (
MODE) 2-1
Loop 1 PID bank (L 1.PI D) 2-1
Loop 2 PID bank (L 2.PI D) 2-4
SP configuration bank (Spcnf) 2-7
Event configuration bank (evcnf) 2-8
Control bank (ctrl) 2-11
MV bank (Mv) 2-13
Setup bank (Setup) 2-14
Priority bank (priOr) 2-15
PV bank (pv) 2-16
Output bank (OUt) 2-18
Position proportional bank (PP) 2-20
CT input bank (CT) 2-20
AC input bank (ac) 2-20
Linearization table bank (tbl) 2-21
Internal contact input bank (i c) 2-26
Digital output bank (dO) 2-28
Logical operation bank (bf) 2-29
User-defined bank (udb) 2-32
Temperature and pressure compensation bank (PV.CMP) 2-32
Input computation bank (I N.FNC) 2-33
Output computation bank (OT.FNC) 2-35
Display/key bank (hMi) 2-37
Operation display switching order bank (dtUrn) 2-39
User-defined operation display creation bank (UdESI ) 2-40
RS-485 communication bank (rS485) 2-41
Lock bank (lOcK) 2-41
Monitor bank (MOni) 2-42
Instrument information bank (I d) 2-46

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Azbil SDC46 and is the answer not in the manual?

Azbil SDC46 Specifications

General IconGeneral
BrandAzbil
ModelSDC46
CategoryController
LanguageEnglish

Related product manuals