EasyManua.ls Logo

Bauer BG 25 - Page 144

Bauer BG 25
183 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MAINTENANCE
BG 25 / 2011 / 2254_BG25_en_0000498763_V01
9 - 22
B00005424.png
NOTE
There is a jaw (16) in front of the rope sheave to facilitate mounting of
the wedge.
Insert the rope into the jaw (16), pre-tension it manually and screw the jaw (16) into
place. Once the wedge (15) has been mounted, remove the jaw (16) from the rope
tensioning cylinder again.
Thread the rope through the wedge (15) (ensuring the other wedge (13) is securely
in place) and attach it with bolts to the rope tensioning cylinder.
Attach the rope clip (14) to the rope end at a distance of approx. 20 mm from the
wedge (15).
Reduce the length of the overhanging rope to approx. 30 cm.
Slightly tension the ropes by retracting the rope tensioning cylinder.

Table of Contents

Related product manuals