28
Connect the line from
the regulator on
cylinder 1 to port 1 at
the back of the monitor.
Ensure the collar on the
hose is drawn back
priortottingontothe
port stump. The collar
should spring forward
and lock into place with
apositiveclick.
Totestconnection,
gently pull back
on the rear of
theconnector,
ensure that you
are not pulling on
the collar release
element. The
connection should
be secure.
Collar drawn back
Collar sprung forward
Collar back, introduce to port Push onto port, collar springs
forward and locks in place
When needle is in green
area, cylinder is full
Needle must point to at least
20 bar (above red area)
Check that each supply
cylinderhassufcient
contents to commence
treatment:opencylinder
valvefully,thenclose
valvefully.Asupply
cylindershouldhavea
llpressuregreaterthan
20 bar before
commencing treatment.
If the gauge needle is in
theredarea,thecylinder
is empty and must not
be used for treatment.
Replace this supply
cylinder to begin setup.
Ifthecylinderisempty,
the system test for
cylinder pressure
contents in the
onscreen QSG will
pause setup.
9.
8.
10.
6.
7.