EasyManua.ls Logo

Bedfont NoxBox - System Test Setup

Bedfont NoxBox
84 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
30
13. Onceallconnectionshavebeenremade,retestthepressurehold.Ifthelinefailsagain
thesystemwillpromptusertoconnectthesecondlineinstead.Calltheserviceengineer
tomakesurethatanyproblemwiththerstsupplylinecanberesolved,orthesystem
replaced as soon as practical.
Repeatthestepsaboveforthe
second supply line
If both lines fail after following
theaboveprocedure,thismay
indicate an internal leak in the
system. The system must be
inspected and repaired by a
qualiedserviceengineerbefore
being used.
4.5 System Test Setup
1. Unwrap a new NOxFlow sensor and
unroll the lines.
2. Identify the single dose-line luer
connector and attach to the monitor
dose luer port as shown. Twist
connector to lock.
14.

Related product manuals