BestCode Next Series 8 Technical Manual October 2022 Page 17 of 290
Commissioning
The commissioning process is a 90-120 minute step by step guide for installing and preparing the Next Series 8 CIJ for
production operation. A video guide is available here: https://youtu.be/fLm1R5ERwo8
Make sure the Next Series 8 Controller is properly mounted. See here for instructions.
WARNING
EQUIPMENT DAMAGE: Do not run the pump until the Pre-Power Up Guide is completed.
Pre-fluid test
Procedure Time: 5 Minutes
1. Navigate to the fluidic screen
Home > Service > Fluidic
2. Press each valve button one at a time
and listen for the click.
Note: Valve 1 Printhead will click
when activated and de-activated since it
is a 3 way. Listen for a Click-Clack when
cycling the valve on and off.
Valve Troubleshooting Here
Commission the Ink Type
Procedure Time: 5 minutes
1. Navigate to the SmartFill Technician
Screen
Login as Technician
>Service>Tools>Technician>Smartfill
2. Select the ink type that matches the ink
to be installed and save
3. Press the Commission System button to
Save
4. Check the Help Screen to confirm