STEP 21 Assemble Roof
C11
S4
C10
E31
B32
B21
C12
Short Roof Joist 2 x 2 x 60¼"
39X
Roof Support Right to
5X
wood screw per each inside hole as shown below.
(S3)
1X
R Roof Support; and
(C11)
Wood Screw #8 x 3"
D7
Roof Support Left to
(E31)
Roof Joist to
(B21)
(C10)
1X
Cedar Roofing 3/8 x 3½ x 47½"
1X
: Connect
#8 x 3 wood
Roof Joist 2 x 2 x 68Ǫ"
Roof Support Left 2 x 4 x 69Ǫ"
E32
C12
C11
Wood Parts
C10
1X
B21
#8 x
117X
Hardware
S0
Short Roof Joist using 1
(S4)
(C12)
2½” wood screws to each outside hole and 1
Roof Support Right 2 x 4 x 69Ǫ"
L Roof Support using 1
2X S3
(B32)
1X
L Roof Support 2 x 4 x 63¾"
A
E31
1X
R Roof Support 2 x 4 x 63¾"
1X
S4
Wood Screw #8 x 2½"
B32
L Roof Support;
Truss Screw #8 x 7/8"
(C10)
screws throught the factory drilled holes per connection.
Lower Roof Support 2 x 3 x 80"
(S4)
#8 x 3”
B
: Attach 18
(D7)
Cedar Roofing to
(C10)
L Roof
Support,
(E31)
Short Roof Joist and
(C12)
R Roof
Support using 3
(S0)
#8 x 7/8” truss screws per board.
C
: Attach 21
(D7)
Cedar Roofing to
(B32)
Roof Support
Right,
(C11)
Roof Joist and
(B21)
Roof Support Left using
3
(S0)
#8 x 7/8” truss screws per board.
D
: Attach
(C32)
Lower Roof Support to
(B32)
Roof
Support Right and
Note: Drill 1/8" pilot hole up 1"
from bottom
D7
center hole
Note:
(E32)
attaches 6" up from end of
(B32)
and 4" up from end of
(C10)
D7
D7
S4
)
X18
S3
S0
S3
S4
D7
X117 (3 per
X21
C10
E32
Pre-drill
1/8" Bit
B32
6"
4"
36