EasyManua.ls Logo

Binder CB Series - Page 157

Binder CB Series
199 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CB / CB-UL, CBF / CBF-UL (E7) 01/2022 Page 157/199
A confirmation prompt is displayed.
Make sure that the water pan was emptied and
all samples were removed from the chamber and
press the Confirm icon to confirm the message.
The controller returns to the initial view and the
program delay time until program start begins.
When the program delay time is over, the hot-air
sterilization cycle begins.
Confirmation prompt.
Normal display with alarm message “Sterilization”.
The sterilization is running.
The zero-voltage relay alarm output and the buzzer
are not activated.
Opening the outer door leads to prematurely terminating the running sterilization cycle. If this happens
during the heating up or holding phase (during 4 hours after starting the sterilization cycle), sterilization will
be ineffective (chap. 21.3.4.1).
NOTICE
Danger of interrupting the temperature reaction time by opening the outer door
during the heating up or holding phase.
Ineffective sterilization.
Do NOT open the chamber doors during the heating up or holding phase of the
sterilization cycle
Glass door and inner chamber become hot during sterilization.
CAUTION
Danger of burning by touching hot chamber parts during a sterilization.
Burns.
Do NOT touch the inner surfaces, inner doors, inner door handles, and door gaskets
during a sterilization.
Note: Since the stored sterilization program cannot be changed, it is not accessible via the program path
Main menu > Programs > Time program.

Table of Contents

Related product manuals