2) Due to different models of the water cooling machine, after turning on the knob, click the
Start button on the panel again to start the water-cooling machine.
3) Due to different power, brand and model of the optical fiber device, the operating method is a bit different.
For example, there is no button on the 500W-1,000W G optical fiber device, and its key switch and switch button are
integrated into the operational software.
For example, for the high-power optical fiber device, open the key switch of the optical fiber device or turn on the handle
switch, and then make the dehumidification device of the optical fiber device run for ten minutes, after that, turn on the
water-cooling machine and make its running temperature up to a certain degree, and then make the optical fiber device emit
light.
For example, for the Bodor Power fiber optic devices with power of less than 1000W, turn on the key switch of the optical
fiber device, after waiting for a few seconds, click START to output red light as instructed; after that, click on the
Shutter button in the software, and then click the " Burst " button, there will be laser under the nozzle.
For example, turn on the key switch of some fiber-optic devices (or rotate the key switch to REM location), click
START (or dont click it), and then click Shutter in the software, and then click the Aiming and Laser buttons.
Due to multiple brands and models of the fiber optic device, other detailed operations are not listed any more, if you have
any questions, please contact us.
3.6 Turning off the Machine Tool
First of all, exit from the software. Click the computer shutdown button , after the computer is completely shut down,
then turn off the main switch of the power supply.
3.7 Summary
This Chapter introduces the preparatory work before starting work. There are no strict requirements for the boot sequence of
various parts, so it is recommended that the boot sequence is as follows: Host machine and operational software Gas
supply device Water-cooling machine Optical fiber device
Tips Shutdown sequence
1) After completing the cutting process, respectively click the N2 or O2 button to discharge the gas in each trachea and