EasyManua.ls Logo

Bodor i5 Series - Page 83

Bodor i5 Series
96 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
www.bodor.com/service@bodor
.com
82
Job nature: Lubrication/Cleaning, Cleaning and lubrication of Z-axis
guide rail and lead screw.
Interval: 500h/time.
Tools/Materials: Cleaning cloth, grease gun, No. 1 lithium grease,
Guide oil for No.32 machine tool.
Job description: Remove the hood components; clean up the linear
guide rail, slide block and ball screw with cleaning
cloth; lubricate guide rail and ball screw, and add
No. 1 lubricating grease to the guide slide block
with a grease gun.
Maintenance Points 1
Maintenance Points 2
Maintenance Points 3
Job nature: Lubrication, Lubrication during the moving process on X,
Y-axis guide rail.
Interval: Configure by system.
Tools/Materials: 32# guide oil.
Job description: Carry out a visual inspection of the quantity of
lubricant on X, Y-axis guide rail; if you need to
adjust it, please contact Bodor engineers.
Job nature: Lubrication/Cleaning, Clean up X, Y-axis rack, gear and
linear guide, and add lubricant to gear rack.
Interval: 500h/time.
Tools/Materials: Cleaning cloth, alcohol, brush, 00# Lithium grease.
Job description: Remove X-axis dustproof cover and Y-axis organ
cover; clean up X, Y-axis rack, gear and linear guide
rail with cleaning cloth; lubricate rack gear after
cleaning.

Table of Contents

Related product manuals