EasyManua.ls Logo

Bosch PRAESENSA PRA-CSLD - Battery and Fuse Installation

Bosch PRAESENSA PRA-CSLD
164 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PRAESENSA Diagnose | en 109
Bosch Security Systems B.V. Configuration manual 2020-09 | V1.20 | PRAESENSA 1.20
Item Description
The status is only visible after using the Start button See the “Start
measuring output load” topic in this chapter. See also
Troubleshooting,
page 133
.
Status messages
Amplifier overload NO YES NO YES
Channel overload NO NO YES YES
Amplifier status OK Amplifier
overload
Channel overload
on A + B
Amplifier
overload
Channel status OK - Channel overload Channel overload
on A + B
Amplifier protection - -12dB - -12dB
Start measuring output load
1. Click the Start button of the selected amplifier:
IMPORTANT: The test signal is audible in all amplifier output channels/zones of the
amplifier selected. Possible you have to schedule this test after working hours, when
less/no people are in the test environment.
As soon the Start button is clicked, the system generates an audio signal to measure
the load connected to each amplifier output channel.
2. Click Channels (below Topology) as soon the measurement has been finished:
Only the overload power (in Watt) connected to the A and/or B output is indicated in
the Overload column. See
Amplifier, page 48
.
!
Caution!
When a load measurement is done with one of the loudspeaker lines shorted, the webpage
will indicate; “not measured”. Resolve the short and start the load measurement again to
resolve this.
Refer to
Amplifier, page 48
System settings, page 69
Add a device, page 41
Troubleshooting, page 133

Table of Contents

Other manuals for Bosch PRAESENSA PRA-CSLD

Related product manuals