Rigging equipment is not included with the NMR system order. The following rigging
equipment will be needed for a typical delivery and installation of an NMR magnet system:
Pallet Jack and/or Fork Lift: For transporting system magnet and accessories to the
laboratory.
A-Frame or Lifting Hook: An A-Frame or lifting hook may be used inside the laboratory
during assembly phase. When a lifting hook is used, the hook capacity must be certified to
hold the required weight of the magnet before installation!