Do you have a question about the Bruker AVANCE and is the answer not in the manual?
Brand | Bruker |
---|---|
Model | AVANCE |
Category | Laboratory Equipment |
Language | English |
Safety notices for transporting and rigging Avance NMR systems, including handling and storage conditions.
Considerations for personnel and equipment proximity to the magnetic field and its forces.
Definition of the Exclusion Zone and restrictions for individuals with medical implants.
Guidelines on magnetic field effects on pacemakers and pregnant workers.
Rules and requirements for ventilation to prevent asphyxiation from cryogen gases.
Need for emergency exhaust systems during initial cooling, fills, or quenches.
Knowledge of cryogenic liquid properties (helium, nitrogen) for safe handling.
Explanation of a magnet quench and its associated helium gas release.
Defining and communicating emergency procedures for NMR system incidents.
Factors for offloading magnet and console during delivery, including area and equipment.
Checking access clearance and floor loading capacity for equipment transport.
Tables showing magnet transport dimensions for different bore sizes and configurations.
Tables listing magnet transport weights for different bore sizes and configurations.
Explanation of calculations for operational and installation ceiling heights.
Tables showing horizontal stray field distances for various field strengths.
Tables showing vertical stray field distances for various field strengths.
How external vibrations affect NMR performance and guidelines for site selection.
Impact of ferromagnetic materials on magnet homogeneity and performance.
Provision for extra equipment power and specific outlet needs.
Requirements for room temperature, humidity, and air flow stability.
Need for emergency exhaust systems due to helium release during quenches.
Recommended passive and active exhaust systems for emergency ventilation.
Requirements for fire detection, extinguishers, and sprinkler systems.
Recommendations for magnet placement to optimize homogeneity and stability.
Tables listing dimensions and weights of NMR equipment.
Requirements for floor strength and rigidity to support equipment.
Type and location considerations for helium compressors.
Ensuring equipment accessibility for delivery and safe transport to the lab.
Checklist of customer-provided items required for system installation.
Final stage of bringing the magnet to field and required cryogen quantities.