Initial Setup
7.12 Installation Testing
It is important to have the unit perform several cycles before completing the installation by ordering
each product selection twice to insure that the machine is operating as per the specications laid out in
this manual. During this process, review the check list as a reminder.
You need to be sure that each machine is clean, safe and functioning when you leave it.
What to check Remedy, if it is not
Inlet valve is free from leaks Verify that it is secure and not overtightened
Brew chamber is empty of coffee Verify that the unit is leveled
Filter paper feeds without resistance and
goes straight into the waste bin
Verify that the chute is properly installed
Repeat the installation procedure
Soluble mixing bowl is free of leaks Verify that it is on straight and tube is secure
Water temperature is acceptable See water temperature
Products are loaded Load the product
Brewer and area are clean and tidy Please tidy up
All switches are in the right position Toggle on or off