EasyManua.ls Logo

Chloride ACTIVE 700 - Installation and Commissioning; Installation Notes for Rack-Mounting Devices GB; Selecting the Installation Site: GB

Default Icon
60 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CHLORIDE ACTIVE Installation and commissioning
945040.066 V02OCT/01 GB - 19
G
B
Installation and commissioning
Inspect the packaging and the device for damages.
Should you find damages, please contact the delivery firm immedi-
ately.
Scope of delivery
This manual
UPS device
Connection cable with IEC 320 plug for the UPS input
Connection distributor with IEC 320 connection for the UPS output
Communication software (CD)
RS 232 interface cable
Installation notes for rack-mounting devices
Selecting the installation site:
All rack-mounting devices (ACTIVE …-19) are intended for horizontal instal-
lation in 19-inch cubicles.
Notice
When installing the UPS, bear in mind the large weight of the individ-
ual components.
For weight purposes, mount the devices as low as possible in the cubicle.
When mounting UPS systems consisting of multiple components, mount the battery
extensions either directly below or directly above the UPS rack device.

Table of Contents

Related product manuals