EasyManua.ls Logo

Circutor CVM-C11-ITF-IN-485-ICT2 - 6�10�- Type of Integration of the Maximum Demand

Circutor CVM-C11-ITF-IN-485-ICT2
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Configuration values
Table 25:Configuration values: Type of installation.
Type of installation
Possible values
4-3Ph Three-phase network measurement with a 4-wire connection.
3-3Ph Three-phase network measurement with a 3-wire connection.
3-AroN Three-phase network measurement with a 3-wire connection and
transformers with an ARON connection.
3-2Ph Two-phase network measurement with a 3-wire connection.
2-2Ph Single-phase network measurement, phase to phase, with a 2-wire
connection.
2-1Ph Single-phase network measurement, phase to neutral, with a 2-wire
connection.
Press key to access the next programming step.
6.10.- TYPE OF INTEGRATION OF THE MAXIMUM DEMAND
In this screen, the type of integration to be used for the calculation of the maximum demand is
selected. See “4.1.2.- MAXIMUM DEMAND”.
Press key for 3 seconds to edit the value. The icon appears at the top of the screen.
The key jumps between the possible options.
To validate the data, press for 3 seconds and the icon will disappear from the display.
Configuration values
Table 26:Configuration values: Type of integration of the maximum demand.
Type of integration of the maximum demand
Possible values
SIide Sliding window
timed Fixed window
Note: When modifying the type of integration, the device restarts the calculation of the maximum
demand.
Press key to access the next programming step.
44
CVM-C11
Instruction Manual

Table of Contents

Related product manuals