EasyManua.ls Logo

Circutor CVM-C11-ITF-IN-485-ICT2 - 6�11�- Maximum Demand Integration Period

Circutor CVM-C11-ITF-IN-485-ICT2
106 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.11.- MAXIMUM DEMAND INTEGRATION PERIOD
The maximum demand integration period is programmed in minutes on this screen. See 4.1.2.-
MAXIMUM DEMAND”.
Press key for 3 seconds to edit the value. The icon appears at the top of the screen.
To enter or modify the value, press the key repeatedly, increasing the value of the flashing digit.
When the desired value is shown on the screen, move onto the next digit by pressing the key to
modify the other values.
To validate the data, press for 3 seconds and the icon will disappear from the display.
The programmed value will be deleted if the entered value is higher than the maximum programming
value.
Configuration values
Table 27:Configuration values: Maximum demand integration period.
Maximum demand integration period
Minimum value 0
Maximum value 60
Note: Programming the value 0 disables the calculation of the maximum demand.
Note: When modifying the integration period, the device restarts the calculation of the maximum
demand.
Press key to access the next programming step.
45
Instruction Manual
CVM-C11

Table of Contents

Related product manuals