Mounting procedure: dimensions, space and handling
34
HS-RC-C5E-TIN_02.fm
00/0411
Operating procedure to remove the pallet
a. Unscrew the 4 screws using the
13-mm socket wrench.
b. Remove the wooden boards
that cross the base or the
wooden items locking the
wheels (if applicable).
c. Lift the C5G from the pallet by
means of a crane / bridgecrane
or lift truck as described in
par. 3.7.3 Lifting the C5G
without package on page 32
and move near the installation
position.
Collect the wooden items, protection cloth and screws and
dispose of them in compliance with the environmental protection
directives.