9 | Electrical installation
Installer reference guide
132
ERLA11~16D + EBBH/X11+16D
Daikin Altherma 3 R W
4P643603-1B – 2022.05
NOTICE
Do NOT cut or remove the backup heater power supply cable.
9.3.3 To connect the shut-off valve
INFORMATION
Shut-off valve usage example. In case of one LWT zone, and a combination of
underfloor heating and heat pump convectors, install a shut-off valve before the
underfloor heating to prevent condensation on the floor during cooling operation.
Wires: 2×0.75mm²
Maximum running current: 100mA
230VAC supplied by PCB
[2.D] Shut off valve
1 Open the following (see "7.2.4To open the indoor unit"[481]):
1 Front panel
2 Switch box cover
3 Switch box
2 Connect the valve control cable to the appropriate terminals as shown in the
illustration below.
NOTICE
Wiring is different for a NC (normally closed) valve and a NO (normally open) valve.