9 | Electrical installation
Installer reference guide
134
ERLA11~16D + EBBH/X11+16D
Daikin Altherma 3 R W
4P643603-1B – 2022.05
3 Fix the cable with cable ties to the cable tie mountings.
9.3.5 To connect the domestic hot water pump
Wires: (2+GND)×0.75mm²
DHW pump output. Maximum load: 2A (inrush), 230VAC, 1A
(continuous)
[9.2.2] DHW pump
[9.2.3] DHW pump schedule
1 Open the following (see "7.2.4To open the indoor unit"[481]):
1 Front panel
2 Switch box cover
3 Switch box
2 Connect the domestic hot water pump cable to the appropriate terminals as
shown in the illustration below.