No. Inspection item Inspection content PTI
2
nd
year 4
th
year 8
th
year
1) Sensor error inspection
2) Chart drive inspection
14
Temperature recorder 3) Recording operation inspection
inspection 4) Loose terminal
5)
Chart drive dry battery inspection
6) Check of pen lifting battery
15
1) Check of wake-up battery
Electronic controller
2) LCD panel replacement
1) Speed switchover
16 Evaporator fan motor
2) Revolution direction
17 Condenser fan motor Rotating direction
18 Evaporator fan
Deformation and damage
inspection
19 Condenser fan
Deformation and damage
inspection
Check for abnormal noise
1
and vibration during operation
2
Temperature control 1) 0˚C operation
function 2) –18˚C operation
3 Defrosting function
4 Unit water-cleaning
3-45
Electrical system
The service life of the wake-up battery is approx. one year (Dry battery). For USDA transportation,
replace the battery with a new Dry battery when PTI is performed.