EasyManua.ls Logo

Daikin LXE10E136 - Full PTI (F.PTI)

Daikin LXE10E136
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3-49
3.8.2.3 Full PTI (F.PTI)
F.PTI consists of S.PTI and operation tests.
Step display and contents
(step P00 to P32 are as same as S.PTI)
Step Content
P50 Check on pull-down to 0˚C
P60 Check on controllability of chilled
mode operation.
P70 Check on defrosting
P80
Check on pull-down from 0˚C through -18 ˚C
P90 Check on controllability of frozen mode
operation
N
Normal operation
UNIT ON/OFF key: on
S.PTI start P00 to P32
Select F.PTI
within 18 seconds
Y
Y
Y
Y
F.PTI
Y
N
N
PTI abnormal end
S.PTI end
Data logging
PTI report
Compressor protective
device activation
Operation test start
P50 to P90
Operation test termination
S.PTI abnormal
N
Abnormal
N
Abnormal reset?
Press the key for 3 seconds
F.PTI flow chart
03LXE10E100(42-52)E.qx08.8.137:00PMページ3-49
https://daikin-p.ru

Table of Contents

Related product manuals