Daikin LXE10E136 - Emergency Operation of Suction Modulation Valve

Daikin LXE10E136
172 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-24
CN9
Binding band
Cap
Cover
Binding band Binding band
Binding band
Bracket
Controller body
Back of coil
6.5.4 Emergency operation of suction modulation valve
If the controller does not work or the suction modulation valve coil has failed, the emergency magnet
can be used to fully open the suction modulation valve.
Disconnect the CN9 connector from the power supply I/O board of the controller to forcibly turn OFF
the power supply to the suction modulation valve.
Remove the binding band of the suction modulation valve cap, and then remove the cap.
Remove the binding band from the upper section of the suction modulation valve coil.
Remove the binding band of the suction modulation valve cover to expose the lower section of the
suction modulation valve coil.
Remove the binding band from the lower section of the suction modulation valve coil.
06LXE10E100(1-26)E.qx08.8.1310:35AMページ6-24