Manual initialization
1. Disconnect from mains and wait until the display
turns o.
2. 2a Press [Status] - [Main Menu] - [OK] at
the same time while powering up (LCP
102, graphical display).
2b Press [Menu] while powering up (LCP
101, numerical display).
3. Release the keys after 5 s.
4. The frequency converter is now programmed
according to default settings.
This procedure initializes all except:
•
Parameter 15-00 Operating hours.
•
Parameter 15-03 Power Up's.
•
Parameter 15-04 Over Temp's.
•
Parameter 15-05 Over Volt's.
NOTICE
Manual initialization:
•
Resets serial communication.
•
Resets parameter 14-50 RFI Filter and fault log
settings.
•
Removes parameters selected in
parameter 25-00 Cascade Controller.
NOTICE
After initialization and power cycling, the display does
not show any information until after a couple of minutes.
How to Programme Programming Guide
M0010001 Danfoss A/S © 10/2019 All rights reserved. 25
2 2