5
7
Introduction and Preparation 9
Document purpose............................................................................................ 10
DD9900 system features...................................................................................10
Product serial number tag (PSNT).....................................................................11
Required tools and supplies .............................................................................. 13
Safety considerations........................................................................................ 14
Working with a portable lift............................................................................... 15
Adjusting the arms for a frontal lift....................................................... 15
Reconfiguring the lift with the Voyager kit........................................... 16
Install the System in the Rack 19
Remove filler panels..........................................................................................20
Recommended rack locations for the system....................................................20
Rail kit components........................................................................................... 21
Remove the original CMA brackets................................................................... 22
Attach the new CMA brackets.......................................................................... 23
Install the rails...................................................................................................25
Install the system in the cabinet........................................................................26
Installing a custom OEM bezel faceplate ..........................................................27
Install the CMA arms.........................................................................................28
Install the Disk Shelves in the Rack 33
Remove filler panels.......................................................................................... 34
Install a DS60 shelf into the rack.......................................................................34
Installing rails....................................................................................... 34
Installing the shelf onto the rails...........................................................38
Inserting and securing the top cover and shelf.....................................40
1U cable management tray installation (underneath)............................43
Install an FS25 shelf into the rack..................................................................... 58
Installing the rails in the cabinet...........................................................59
Installing the shelf on the rails..............................................................60
Installing the front bezel...................................................................... 62
Connect Cables and Power On 63
Connecting DS60 shelves................................................................................. 64
DD9900 with DS60 cabling.................................................................. 64
Connecting the HA interconnect.......................................................................66
Connecting data cables.....................................................................................67
Connecting disk shelf power cables.................................................................. 68
Connecting controller power cables and powering on....................................... 68
Routing the cables through the CMA................................................................69
Figures
Tables
Chapter 1
Chapter 2
Chapter 3
Chapter 4
CONTENTS
Dell EMC PowerProtect DD9900 System Installation Guide 3