Figure 73. Installing the M.2 BOSS card
Next steps
1. Install the M.2 BOSS module.
2. Follow the procedure listed in the After working inside your sled.
Mezzanine card
Your system supports two mezzanine cards:
● PCIe mezzanine card slot A supports fabric A. This card must match the fabric type of I/O modules installed in I/O module
bays A1.
● PCIe mezzanine card slot B supports fabric B. This card must match the fabric type of I/O modules installed in I/O module
bays B1.
NOTE: The Mezzanine B1 card requires processor 2 to be installed.
Removing the Mezzanine card
Prerequisites
1. Follow the safety guidelines listed in Safety Instructions.
2. Follow the procedure listed in Before working inside the sled.
Steps
1. Use the Phillips #2 screwdriver, loosen the captive screws that secure the Mezzanine card to the system.
2. Lift the Mezzanine card out of the sled.
NOTE: To prevent damage to Mezzanine card, you must hold the card only by its edges.
Installing and removing system components 75