The method of moving the central inverter by using a forklift or pallet trunk is the
same whether the unit is packed in a shipping crate or not. Follow these steps:
1. Place the forks of the forklift or pallet trunk under the unit and pay attention
to the center of gravity of the unit.
2. Lift the unit and move to the installation site directly.
3.3.1 Using a Forklift or pallet trunk
Figure 3-7 : Moving the Central Inverter
The method of moving the central inverter by using a crane is different if the unit
is packed or unpacked in a shipping crate. Follow these steps respectively:
If the unit is packed in a shipping crate:
1.
Use wire rope to secure the inverter, and make sure that it is evenly weighted.
2. Lift up the inverter and transfer to the installation site steadily.
3. Unraveled the wire rope.
3.3.2 Using a Crane
Figure 3-8 : Using the Wire Rope
21
Transportation & Installation Preparation

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Delta C1000 and is the answer not in the manual?

Delta C1000 Specifications

General IconGeneral
BrandDelta
ModelC1000
CategoryInverter
LanguageEnglish

Related product manuals