EasyManua.ls Logo

Delta C1000 - Page 22

Delta C1000
178 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If the unit is unpacked in a shipping crate:
1. Open the front and back door of the central inverter.
2. Loosen the screws on the top cover. (Torque: 25 Kgf-cm)
3. Remove the top cover of the inverter.
Figure 3-9 : Loosen the Screws on the Top Cover
Figure 3-10 : Removing the Inverter’s Top Cover
22
Transportation & Installation Preparation

Table of Contents

Related product manuals