OPERATION MANUAL FOR PCS100HV
12
tr16
S1
S6
Run Mode: Grid-forming
(Stand Alone)
Command On.
Register map refer to tr12.
Delay about 10s.
1
R
0x1000
0x01
M
Check step1: 0x1000 equal to ‘0x01’-Pass,
If step1 fail, execute step2 until step1 pass.
Check step3: 0x06F4 equal to ‘0x01’-Pass,
If step3 pass, process step4.
Final PCS state is ‘0x05-SA Soft start mode.
2
W
0x1000
0x01
O/M
3
R
0x06F4
0x01
M
4
W
0x1001
0x01
M
5
R
0x06F4
0x05
O
tr67
S6
S7
Soft start stage is done.
Delay about 3s.
1
R
0x06F4
0x05
O
This transition is being done automatically.
Final PCS state is ‘0x06-SA Normal run
mode.
2
R
0x06F4
0x06
O
Note: a time delay between command and next state request should be over 50ms.
Note2: PCS will respond the corresponding operation only after the system state enters normal operation. for example, the power demand commands
only available under the normal run state of grid-tied mode(0x03), Voltage and Frequency regulation only available under the normal run state of stand-
alone mode.
Note3: The time delay is an approximate time of execution of ONE PCS. It needs an additional about 3 seconds for each PCS for parallel system.