OPERATION MANUAL FOR PCS100HV
38
Step 5: after completing the configuration, check whether PCS100HV is “Standby” status, if it is, the upper level controller sends “Power ON” command
to PCS100HV. PCS will synchronize with grid.
Step 6: when PCS100HV enters the “Normal” status, the upper level controller sends “Reactive Power” or/and “Active Power” command to PCS100HV,
it will output the corresponding power to the grid. See below table for parameters of power on and power command of PCS100HV.
Table 14 Parameters of power on and power command
Please Check if PCS State is in
Standby first.
After a few seconds (About 8-
10s), PCS state would change
to “RUN”. Or check register
0x06F4.
Set Active Power Command.
Value in Hex, unit is 0.1kW.
0xC8 is 20kW for example.
Set Reactive Power Command.
Value in Hex, unit is 0.1kVar
NOTE
:
1. When PCS is running, user could change commands for active and reactive power (step 6 and 7) when it is necessary.
2. Model PCS100HV: Prated is 100kW.