Please read carefully the information provided in this chapter in order to
ensure proper functioning of ROTOGRAPH PLUS.
The supplier is able to provide assistance and the necessary technical
advice necessary for the pre-installation phase; building works and the
pre-installation phase are to be charged to the customer and must be
made according to the information provided.
The room pre-installation requirements for a successful installation are:
• a minimum room ceiling height of 8 ft (2,5 mt) and an area to accept
ROTOGRAPH PLUS with its different configuration as showed on
drawings in Figure 5-1 and Figure 5-2.
• to transport the system into the room the doors must have a
minimum width of 36" (80cm).