EasyManua.ls Logo

Dionex ASE 150 - Page 26

Dionex ASE 150
176 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
ASE 150 Operator’s Manual
18 Doc. 065207-02 9/08
Monitoring the Progress of a Run
To monitor the progress of a run, press MENU, move the cursor to STATUS (if
necessary), and press
ENTER. The STATUS screen appears (see Figure 2-5).
The
STATUS screen operating parameters are updated in real time.
STATUS—the current system status. During a run, the status field displays the
following status states (in the order given): Oven Wait, Oven Ready, Load,
Preheat (optional), Fill, Heat, Static, Rinse, Purge, Relief, Unload, and Idle.
METHOD—the name or number of the current method.
VOL—the approximate volume of solvent (in mL) delivered by the pump
since the method started running.
PRESSURE—the current sample cell pressure reading.
TEMP—the temperature specified in the method.
TIME—the elapsed time since the method started running.
Figure 2-5. Status Screen Example
STATUS STATIC
METHOD PCB
PRESSURE
TIME
1565PSI
VOL
75mL
2:25
TEMP 100C

Table of Contents