1-42
Chapter 1 Before Operation
Turning on the power
Setting the control panel(*)
Preparing the DBM-600 and the DBM-
600T
Preparing the upstream unit
Step mode(*)
Checking the nished booklet
(p.2-3)
(p.2-16)(p.2-19)
(p.2-20)
DBM-600
Adjusting each section
DBM-600T
Starting binding operations(*)
Step mode
Turning o the power
(p.2-20)
(p.2-25)
(p.2-48)
(p.2-2)
(p.2-37)
(p.2-42)
(p.2-20)
(p.2-1)
8. Workflow
The owchart below illustrates the ow of basic operation. For details, refer to the text and relevant pages.
(*) When using the PC CONTROLLER, refer to the PC CONTROLLER operation manual.