44..33..33 UUPPSS ssyysstteemm ppoowweerr wwiirriinngg pprreeppaarraattiioonnss
CAUTION
When you are installing a maintenance bypass, use a dual-feed input protected
by an upstream circuit breaker or a single-feed input protected by two upstream
circuit breakers, one for the UPS/rectifier input breaker (if installed), and the
other for the maintenance bypass input. Do not use only a single-feed and
single-breaker protection for the UPS/rectifier input and maintenance bypass. If
the UPS uses a single feeder line and a bypass input breaker is mounted on the
maintenance bypass, a maintenance bypass single-feed input is allowed, and
power can be supplied to the UPS and bypass simultaneously.
Read and understand the following guidelines when planning and performing the installation:
Refer to national and local electrical codes for acceptable external wiring practices.
To allow for future kVA upgrades, select the power line and the external overcurrent protection switch
for derating under full load.
Material and labor required for external wiring are not part of the UPS delivery.
For external wiring, use copper cable rated for 90 at minimum. For more information, refer to Table
7: Input/output ratings and external cabling recommendations for the 93T UPS 15–80 kVA. Cable sizes
are based on using the specified circuit breakers.
If the operating temperature of the conductor rises above 40 , use a larger size cable or a cable that
is resistant to higher temperatures.
The wiring specifications are for 90 rated copper cables.
Use a wire with an applicable size to allow future upgrades.
CAUTION
For UPS systems configured with a 4-pole ATS or generator:
The input uses three live wires, a neutral wire, and a protective earthing
conductor. The phase lines must be symmetrical about ground (from a Wye
source) for proper equipment operation.
Support loads with a neutral wire.
Make sure that the switching of the upstream ATS does not disconnect the
neutral wire, or that the system recovers from an input neutral wire
disconnection before a low battery voltage alert.
When the neutral wire is disconnected, make sure that all phase lines are also
disconnected.
Table 7. Input/output ratings and external cabling recommendations for the 93T UPS 15–80 kVA
Unit Rating 50/60 Hz
Basic unit rating kVA 15 20 30 40 60 80
Input/output voltage Volts 400/
400
400/
400
400/
400
400/
400
400/
400
400/
400
Rectifier input (5-wire) A 27 36 54 72 108 144
EATON 93T USER’S AND INSTALLATION GUIDE 614-40270
-