EasyManua.ls Logo

Emerson Rosemount TCL - Page 92

Emerson Rosemount TCL
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12. Connect the air inlet and outlet tubing to the air pump.
See Figure 10-14. The conical end of the check valve points in the direction of the air
flow.
13. Replace the air pump access panel.
14. Connect the sample pump tubing to the pump. Connect the reagent and injection
tubing. Connect the air inlet tubing to the barbed fitting at the bottom of the
enclosure.
Replacement Parts and Reagent for Sample Conditioning SystemTable 10-2:
PN Description
24134-00 Air pump, 115 Vac, 60 Hz
24134-01 Air pump, 230 Vac, 50 Hz
9160578 Air pump repair kit
9322052 Check valve for air injection line
24153-00 Carboy for reagent, 5 gal/19 L, includes cap
9100204 Fuse, 0.25 A, 250 V, 3 AG, slow blow for option -11 (115 Vac)
9100132 Fuse, 0.125 A, 250 V, 3 AG, slow blow for option -12 (230 Vac)
9380094 Reagent pump, 115 Vac, 50/60 Hz
9380095 Reagent pump, 230 Vac, 50/60 Hz
9380091 Reagent pump replacement tubing
24151-00 Reagent tubing replacement kit (see Section 10.3.2)
24135-00 Reagent uptake tubing, 65 ft (1.8 m), includes weight
9380090 Sample pump, 115 Vac, 50/60 Hz
9380093 Sample pump, 230 Vac, 50/60 Hz
9380092 Sample pump replacement tubing
24152-00 Sample tubing replacement kit (includes tees, see Section 10.3.2)
24165-00 Acetic acid, 2 x 2.5 gal (9.5 L) bottles/case, with 25 g potassium iodide
24165-01 Acetic acid, 2 x 2.5 gal (9.5 L) bottles/case, with 50 g potassium iodide
24164-00 Potassium iodide, 25 g, sufficient for 5 gallons (19 L) of vinegar (for 0 - 5 ppm
total chlorine)
24164-01 Potassium iodide, 50 g, sufficient for 5 gallons (19 L) of vinegar (for 0 - 10 ppm
total chlorine)
Maintenance
84 Rosemount TCL

Table of Contents

Other manuals for Emerson Rosemount TCL

Related product manuals