EasyManua.ls Logo

Endress+Hauser Proline Prosonic Flow 93T Portable - 6 Commissioning; Function Check; Switching on the Measuring Device; Resetting the Measuring Device

Endress+Hauser Proline Prosonic Flow 93T Portable
124 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Commissioning Proline Prosonic Flow 93T Portable
40 Endress+Hauser
6 Commissioning
6.1 Function check
Make sure that all final checks have been completed before you commission your measuring point:
Checklist for "Post-installation check" ä 30
Checklist for "Post-connection check" ä 32
6.2 Switching on the measuring device
#
Warning!
The measuring device only complies with the general safety requirements in accordance with
EN 61010-1 and the EMC requirements of IEC/EN 61326 during storage battery operation.
Disconnect the charger from the measuring device for measuring operation.
The measuring device is switched on by pressing the ON/OFF switch 3 seconds ( ä 31,
å 36, No. 1).
The measuring system performs a number of internal test functions after power-up. During this
process, the following sequence of messages appears on the local display:
Normal measuring mode commences as soon as startup completes.
Various measured value and/or status variables appear on the display (HOME position).
!
Note!
If startup fails, an appropriate error message is displayed, depending on the cause.
6.2.1 Resetting the measuring device
The measuring device is reset by pressing the ON/OFF switch 30 seconds ( ä 31, å 36,
No. 1). Only the internal clock of the measuring device is reset during the reset. All the other
settings remain unchanged.
PROSONIC FLOW 93
START-UP
RUNNING
Startup message
Æ
PROSONIC FLOW 93
DEVICE SOFTWARE
V XX.XX.XX
Display of current software
Æ
CURRENT OUTPUT
Display of installed input/output modules
Æ
SYSTEM OK
OPERATION
Beginning of standard measuring mode
Æ

Table of Contents

Related product manuals