Commissioning Proline Prosonic Flow 93T Portable
40 Endress+Hauser
6 Commissioning
6.1 Function check
Make sure that all final checks have been completed before you commission your measuring point:
• Checklist for "Post-installation check" ä 30
• Checklist for "Post-connection check" ä 32
6.2 Switching on the measuring device
#
Warning!
The measuring device only complies with the general safety requirements in accordance with
EN 61010-1 and the EMC requirements of IEC/EN 61326 during storage battery operation.
Disconnect the charger from the measuring device for measuring operation.
The measuring device is switched on by pressing the ON/OFF switch 3 seconds ( ä 31,
å 36, No. 1).
The measuring system performs a number of internal test functions after power-up. During this
process, the following sequence of messages appears on the local display:
Normal measuring mode commences as soon as startup completes.
Various measured value and/or status variables appear on the display (HOME position).
!
Note!
If startup fails, an appropriate error message is displayed, depending on the cause.
6.2.1 Resetting the measuring device
The measuring device is reset by pressing the ON/OFF switch 30 seconds ( ä 31, å 36,
No. 1). Only the internal clock of the measuring device is reset during the reset. All the other
settings remain unchanged.
PROSONIC FLOW 93
START-UP
RUNNING
Startup message
Æ
PROSONIC FLOW 93
DEVICE SOFTWARE
V XX.XX.XX
Display of current software
Æ
CURRENT OUTPUT
…
Display of installed input/output modules
Æ
SYSTEM OK
OPERATION
Beginning of standard measuring mode
Æ