6.4 Application-specific commissioning
6.4.1 Zero point adjustment
Zero point adjustment is generally not necessary!
Experience shows that the zero point adjustment is advisable only in special cases:
To achieve highest measuring accuracy with very low flow rates.
Under extreme process or operating conditions (e.g. very high process temperatures or very high
viscosity fluids).
Preconditions for a zero point adjustment
Note the following before you perform a zero point adjustment:
A zero point adjustment can be performed only with fluids that have no gas or solid contents.
Zero point adjustment is performed with the measuring tube completely filled and at zero flow
(v=0 m/s). This can be achieved, for example, with shutoff valves upstream and/or downstream
of the measuring range or by using existing valves and gates ( ä 44).
Standard operation Valves 1 and 2 open
Zero point adjustment with pump pressure Valve 1 open / valve 2 closed
Zero point adjustment without pump pressure Valve 1 closed / valve 2 open
"
Caution!
If the fluid is very difficult to measure (e.g. containing entrained solids or gas) it may prove
impossible to obtain a stable zero point despite repeated zero point adjustments. In instances of
this nature, please contact your Endress+Hauser service center.
You can view the currently valid zero point value using the ZERO POINT function.
A0011585
Fig. 43: Zero point adjustment and shutoff valves
1
2

Table of Contents