Site Preparation
1 Site Preparation
Select the installation site for the SmartEdge
®
600 router, considering
maintenance, electrical, and ventilation requirements. In addition, consider
current and future cabling requirements.
1.1 Agency Compliance Information
Table 1 Agency Compliance Standards
Product Safety Emissions Immunity NEBS Level 3
UL 60950
CSA 22.2 No. 60950
IEC60950
EN60950
AS/NZS 60950
FCC part 15, Class A
ETSI EN300 386
CISPR 22 Class A
VCCI Class A
EN55022, Class A
AS/NZA 3548 Class A
EN61000-4-2
EN61000-4-3
EN61000-4-4
EN61000-4-5
EN61000-4-6
ETSI EN300 386
GR-63-CORE
GR-1089-CORE
Caution!
Risk of equipment damage. The intrabuilding ports of the line cards are suitable
for connection to intrabuilding or unexposed wiring or cabling only. These ports
must not be metallically connected to interfaces that connect to the outside
plant (OSP) or its wiring. These interfaces are designed for use in intrabuilding
interfaces only (Type 2 or Type 4 ports as described in GR-1089-CORE, Issue
4) and require isolation from the exposed OSP cabling. The addition of primary
protectors is not sufficient protection to connect these interfaces metallically to
OSP wiring.
Note: The SmartEdge 600 router is suitable for installation in Network
Telecommunications Facilities and as part of the Common Bonding
Network (CBN).
1.2 Electrical Specifications
Table 2 DC Electrical Specifications
Requirement Value
Input voltage, nominal –48.0 VDC
Input voltage range –40.0 VDC to –57.5 VDC
127/153 30-CRA 119 1170/1 Uen A | 2010-04-09