4 05 2013 4365 00
safeties
- Door switch
- boiler safety thermostat with manual reset
- air-break float jamming
- anti-flooding solenoid valve
- full liquid waste container float
- boiler probes interruption/short circuit control
- time protection of:
Pump
Infuser unit gear motor
Freshbrew beverage delivery
Column shift motor
- thermal protection of:
Ingredient motors
Infuser unit gear motor
Pump
Mixer motors
- protection with fuse
Board and coin box power supply transformer
(Primary and secondary)
Containers CapaCity
The machine can be tted with dierent combinations
of containers of a dierent type for dispensing dierent
types of products.
Leaf tea Kg. 4.5
Ground coee Kg. 3.2
For the instant products, depending on the models, the
machine can be tted with containers with a capacity of
2.5, 4 or 6 l.
The indicative product quantity is summarised in the fol-
lowing table
Container dimension
1.8 lt. 2.5 lt. 4.5 lt. 6 lt.
Instant coee (Kg) 0.4 0.6 1.0 1.3
Instant Milk (Kg) - 0.7 1.2 1.7
Instant chocolate (Kg) - 1.7 3.2 4.5
Sugar (Kg) - 2.0 3.5 5.0
Instant lemon tea (Kg) - 2.0 3.5 5.0
Instant soup (Kg) - 1.4 2.5 3.5
Ginseng (Kg) - 1.8 - -
The real quantity can dier from the one indicated
because of the dierent specic weight of the various
products.
poWer Consumption
The power consumption of the machine depends on
many factors, including the temperature and ventilation
of the environment where the machine is located, the
temperature of the inlet water, the boiler temperature,
etc.
A measurement at a room temperature of 22 °C was
carried out and the following power consumption was
detected:
Reaching temperature Wh 445
24h standby: Wh 2809
The power consumption calculated on the above-men-
tioned average data shall be deemed as purely indica-
tive.
aCCessories
The machine can be tted with a wide range of accesso-
ries in order to vary its performances:
The installation kits are supplied with installation and
test instructions, which shall be scrupulously followed in
order to maintain the safety of the machine.
The installation and the subsequent test operations
both from the point of view of electrical safety and
of hygiene.