Installation
20.10.22 Kapitel/Chapter 4: Installation - Seite/Page 35
4.7 Start-up
After completing the installation, the system must be started up.
For this purpose, the start-up log for the generator is processed and filled in by the specialist installing the
equipment. The completed log shall be handed over to the operating company.
The operating company shall be instructed in the operation, maintenance, and hazards of the generator. This
applies to both the maintenance steps and hazards described in the manual and to additional steps and hazards that
result from the specific installation conditions and the connected components.
Note!The original start-up log of the generator must be sent to
Fischer Panda to obtain the full warranty. Make sure that
you retain a copy for your records.
The corresponding forms are included in the generator
manual.