45
Service Manual
5-18
Table 5-5. Display Initialization
A2TP4 Dtest* A2TP5 LTE* Power-Up Display
Initialization
1
1
0
0
1
0
1
0
All Segments OFF
All Segments ON (default)
Display Test Pattern #1
Display Test Pattern #2
0
15
6
ANODE(10)
GRID(10)
ANODE(12)
ANODE(13)
REMOTE
EXT TRG
11
24
3
7
0
15
6
GRID(9)
13 12 11
SMF
10
24
3
7
0
15
6
GRID(8)
11
MAX
MIN
10
24
3
7
0
15
6
GRID(7)
11
dB
HOLD
10
24
3
7
0
15
6
GRID(6)
11
MAX
10
24
3
7
01
6952
3487
GRID(5)
11
AUTO
mA
m V AC DC
HzΩkM
10
qb26f.eps
Figure 5-5. Primary Display
0
15
6
ANODE(9)
GRID(4)
ANODE(12)
ANODE(13)
UNCAL
TOTAL
24
3
7
0
15
6
GRID(3)
12
m
13
A
12
m
13
V
10
2
4
3
8
2
8
2
8
7
0
15
6
GRID(2)
4
3
7
0
15
6
GRID(1)
13
AC
kHz
10
M
12
Ω
11
24
3
7
0
15
6
GRID(0)
13
DC
12
4
3
7
qb27f.eps
Figure 5-6. Secondary Display
When a Fluke 45 display is initially powered up, all display segments should come on
automatically. If this display does not appear, proceed with the following steps:
Note
If the display is operational but has problems with front-panel button
presses, proceed directly to step 9.