General Maintenance
Assembly Procedures
3
3-15
3-33. Install the Front Panel Assembly
Use the following procedure when installing the Front Panel Assembly:
1. Snap the Front Panel Assembly into place in the four tab retainers ("B").
2. Observing the alignment orientation provided by tabs on the connector, attach the
display ribbon cable connector ("A") on the Main PCA.
3. Attach the wires at the rear of the front panel input terminals. Observe the following
color coding:
• At the rear of the 100 mA input terminal, carefully insert the spring (attached to
the white wire) into the fuse holder.
• Using needle nose pliers, connect the wires at the rear of the input terminals as
follows:
z Red
[COM] Black
[10 A] Yellow
• Install the front panel 100 mA input fuse (F1).
3-34. Install the Handle and Mounting Brackets
Refer to Figure 3-4 during the following procedure. Use a Phillips head screwdriver to
attach the two handle mounting brackets. Note that these brackets must be reinstalled in
their original positions. Therefore, the inside of each bracket is labeled with an "R" or an
"L", in reference to the front view of the meter.
Now, engage the handle. Point the handle straight up. Then pull out on each end of the
handle to engage the respective pivot in its bracket. Pull out slightly on both pivots to
rotate the handle to the desired position.
3-35. Install the Meter Case
Reinstall the meter case, checking that it seats properly in the front panel. Attach the rear
bezel with the two panhead Phillips screws and secure the case with the flathead Phillips
screw in the bottom. Refer to Figure 3-3.