3 Operating the system
3.1 Initial start-up
Optimum efficiency and efficient, low-emission operation can
only be guaranteed if the system is set up by trained
professionals and observing the standard factory settings.
Take the following precautions:
Initial start-up should be carried out with an authorised installer or with
Fröling customer services.
The individual steps for initial start-up are explained in the operating
instructions for the controller.
See Section 4 for instructions on the Lambdatronic P 3200
If condensation escapes during the initial heat-up phase, this does
not indicate a fault.
If this occurs, clean up using a cleaning rag.
3.2 Filling/ refilling the store with fuel
Damage and injuries can occur if the store is filled when the boiler is
on!
Turn off the boiler by pressing the key for 5 seconds
Allow the boiler to cool down for at least half an hour.
When the boiler has cooled down:
Close all opening to the store to seal out dust
Fill the store with pellets
Only use permitted pellets
Page 13, 2.2.1 Permitted fuel