EasyManua.ls Logo

Fujitsu PRIMERGY TX150 S6

Fujitsu PRIMERGY TX150 S6
127 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TX150 S6 Operating Manual 77
Starting up and operation Switching the server on and off
Switching the server off
The power-on indicator lights up green (item 2 in figure 24 on page 67).
Ê Shut down the operating system properly.
The server is switched off automatically and goes into standby mode. The
power-on indicator lights up orange.
I If the operating system does not switch the server off automatically, press
the On/Off button for at least four seconds and/or send a corresponding
control signal.
Other On/Off options
In addition to the On/Off button, the server can be switched on and off in the
following ways:
Specified switch on time / switch off time
The ServerView program allows you to set a time at which the server is to
be automatically switched on or off.
Ring indicator
The server is switched on by an internal or external modem.
Wake up On LAN (WOL)
The server is switched on by a command from the LAN.
After power failure
The server is automatically switched on following a power failure (depending
on the BIOS settings).
“Power override” function
The server can be switched off immediately by pressing and holding the
On/Off button (approx. 4-5 sec.).
V CAUTION!
There is a risk that data may be lost.
IPMI
The server is switched on from an IPMI console (via the COM1 serial
interface or the RJ45 LAN interface).

Table of Contents

Other manuals for Fujitsu PRIMERGY TX150 S6

Related product manuals