EasyManua.ls Logo

GE Baker Hughes PanaFlow LC XMT1000 - Chapter 2. Installation; 2.1 Installation Guidelines

GE Baker Hughes PanaFlow LC XMT1000
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PanaFlow™ LC User’s Manual 3
Chapter 2. Installation
Chapter 2. Installation
2.1 Installation Guidelines
This section provides general information with respect to the mechanical and electrical installation, and
should be thoroughly reviewed before the system is installed. To ensure safe and reliable operation of the
PanaFlow™ LC, the system must be installed in accordance with the established guidelines. Those
guidelines, explained in detail in this chapter, include the following topics:
Unpacking the PanaFlow LC System
Site Considerations
Making Electrical Connections
WARNING! The PanaFlow™ LC flow meter can measure the flow rate of many fluids, some
potentially hazardous. The importance of proper safety practices cannot be overemphasized.
WARNING! Be sure to follow all applicable local safety codes and regulations for installing
electrical equipment and working with hazardous fluids or flow conditions. Consult company
safety personnel or local safety authorities to verify the safety of any procedure or practice.
Attention European Customers! To meet CE Mark requirements, all cables must be installed as
described in Appendix D, CE Mark Compliance.

Table of Contents

Related product manuals