EasyManua.ls Logo

GE Baker Hughes PanaFlow LC XMT1000 - Page 26

GE Baker Hughes PanaFlow LC XMT1000
190 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 2. Installation
12 PanaFlow™ LC User’s Manual
2. Prepare the pipe where you intend to place the SCF by making sure it is clean and free of loose
material. Sanding, though usually not required, may be necessary to remove any high spots. However,
be careful to preserve the original curvature of the pipe.
3. Use a level to find the top of the pipe and then draw a line parallel to the centerline of the pipe.
Figure 10: SCF Odd Number of Traverse Installation, Step 3
4. Using a level and center punch, make two marks on the line drawn in step 3. These marks must be
separated by the transducer spacing distance S, as calculated by the flowmeter.
Figure 11: SCF Odd Number of Traverse Installation, Step 4
5. From one of the marks on the top of the pipe, measure around the pipe a distance equal to 1/4 of the
pipe circumference, or a distance that will satisfy the orientation found in Step 1. Use the center
punch to make a mark at this point.
Figure 12: SCF Odd Number of Traverse Installation, Step 5

Table of Contents

Related product manuals