4 Installation
About this chapter
This chapter describes site requirements and preparations necessary to perform before
installation of the Biacore X100 system.
In addition, instructions are included for moving the Biacore X100 system within the lab
or to another building.
NOTICE
Biacore X100 is prepared and installed by GE personnel. Contact
GE if you require re-installation at a new site.
In this chapter
See pageSection
404.1 Site requirements
434.2 Unpacking, assembly and transport
444.3 Connections
Biacore X100 Operating Instructions 28961142 AD 39
4 Installation