5 Operation
About this chapter
This chapter gives instructions on how to operate the product in a safe way.
In this chapter
See pageSection
495.1 Overview
505.2 Starting the instrument
535.3 Preparing, loading and changing buffers
545.4 Inserting a sensor chip
565.5 Setting the analysis temperature
575.6 Preparing and loading samples and reagents
595.7 Starting a run
605.8 Post-run procedures
Safety precautions
WARNING
Always wear appropriate protective clothing and equipment during
operation and maintenance of the Biacore X100 system. Use re-
quired safety equipment when handling hazardous substances.
WARNING
Do not use any accessories not supplied or recommended by GE.
46 Biacore X100 Operating Instructions 28961142 AD
5 Operation