EasyManua.ls Logo

GE Biacore X100 - Post-Run Procedures

GE Biacore X100
93 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5.8 Post-run procedures
Introduction
After a run, take care of the chip (see below) and choose whether to leave the instrument
in standby or perform a shutdown (see Leave the instrument, on page 60).
Remove the sensor chip
Then...When...
Leave the chip in the instrument and make sure there is
enough buffer in the buffer bottle for the standby period.
The sensor chip will be
reused in next run
Remove the chip and store the chip wet or dry according
to recommendations in the Biacore Sensor Surface
Handbook.
The sensor chip will be
reused in a later run but
not in the next run
Insert an old chip or the maintenance chip and start
standby.
Leave the chip in the instrument or replace it with the
maintenance chip and start standby.
The sensor chip will not
be used again
Leave the instrument
Then...When...
Prepare the system for standby.If the instrument will be
used within 7 days
Perform a shutdown.If the instrument will not
be used for more than 7
days
See Section 6.7 Storage, on page 74 for details of these procedures.
60 Biacore X100 Operating Instructions 28961142 AD
5 Operation
5.8 Post-run procedures

Related product manuals